
Strategic Placement Pipe
Installed beneath the vapor barrier to safely vent radon from the crawlspace.

Manometer
Measures pressure differences to confirm the sub-membrane depressurization system is working properly.

Radon Fan
Positioned to maintain steady airflow and reduce radon levels effectively.

Furnace Platform Seal
Vapor barrier sealed tightly around the furnace platform to block radon entry.